Possibility that the automatic line closure by the Electronic Remote-Controlled (ERC) clamp after detection of an air bubble could take longer than is intended by design in the CP5 system.
Sorin Group Deutschland GmbH
Class I - Dangerous
Sorin is initiating a field correction on S5/C5 Heart-lung machine and CP5 centrifugal pump system due to reports of pump speed control knob failures resulting in no response.
Class I - Dangerous
Sorin is initiating a field correction on S5/C5 Heart-lung machine and CP5 centrifugal pump system due to reports of pump speed control knob failures resulting in no response.
Sorin Group is recalling certain models of S5 Perfusion Systems due to malfunction of cardioplegia control.